Email login
Chinese
Where you are:首页 Projects Advanced Construction Technology and Precast Concrete Segmental Construction

Viaduct Section of Guangzhou Metro Line 6

The viaduct of Guangzhou Metro Line 6 is 3.2km long and consists of two types of frame systems, the standard frame and the ‘Y’ shaped frame. The standard frame system consists of 3 or 4 continuous concrete box girder spans of 40m and twin-thin-walled piers. The concrete box girder is built with segmental pre-cast concrete technology.

Services: conceptual, preliminary, and final designs as well as consulting for construction and large scale structural testing.

follow US:

Share:

  • Site Map
  • Private Policy
  • Links
  • 粤公网安备 44010602005562号

Copyright 2017 Guangzhou Sun Engineering Consulting Co., Ltd. 粤ICP备12038171号-1All Rights Reserved. Designed by Wanhu